ENG. ANDREA RITOSSA is a professional working in the field of civil engineering with particular reference, but not only, to the maritime-coastal sector and port engineering..
Final and executive design of Waterways: Terramaini Canal
Project for the construction of a shipyard Olbia
Construction of a railway yard in Oristano Harbor
Design of the interventions to comply with the current port planning scheme
Design of a dock for large yachts at the Brin Pier in Olbia
Construction of the new the ferry dock in Porto Corsini
Completion of defense works, docks, systems
Coastal defense works of the eastern Ostia coastline
Project of an offshore wind farm located in Southern Sardinia
Project of an offshore wind farm located in Southern Sardinia
Environmental redevelopment of the gulf of Rapallo
Fleet type upgrading – Mooring of Giga Yachtss
Extension of the East Pier of Golfo Aranci Port
Reclamation, dredging of the seabed - dock area and panels
Design of primary infrastructure works
Completion of the defense works and internal docks
Seafloor restoration works, quayside maintenance
Design of sea works, renovation of the waterfront
Project for the construction of a waterfront mooring point
Waterfront – last tranche of Cala Balbiano works at sea
Design, work supervision and safety, various interventions
Safety of road and rail sections - Bosa
Project for the completion of the tourist port of Calasetta
Project for the construction of a quay, Olbia port
General preliminary design of the port of Cannigione
Marine weather studies, preliminary design surveys
Renovation work on oil jetty for ships
Project for a fishing dock in the Port of Cagliari
Completion work on the tourist and fishing port
Final project, dredging works of the port of Camogli
Project for the construction of a fishing port (CA)
Port and land works project in Golfo Aranci
Project for the extension of the marina of Portisco
Preliminary design of sustainable port interventions
Design for the completion of the quaysides
Restoration and defence of the works of the port of Porto Corallo
Design and construction supervision of the Marina di Olbia landing stage
Louis Vuitton Cup 2010 - Completion of the Marina of Cala Camicia
Feasibility study for interventions required to protect the coastline
Reinforcement of Sant'Anna Pier to protect the waterfront
Preliminary design of the sewerage system
Design for the urban water network redevelopment
Upgrading, completion of the sewage treatment plant
Implementation of the purified water distribution network
Upgrading and recovery of water mains leaks
Project for the reorganization of the coastal strip, Quartu S. Elena
Hydraulic system improvement of Rio San Girolamo - Masone Ollastu
Executive design for interconnection of water systems
Project for the reuse of water for irrigation purposes in coastal tourist centres
Project for a parking system serving the urban area
Parking system project serving the urban area
Executive design of the road maintenance works
Road completion and safety project
Feasibility study for the rationalization of the road network
Construction of a connecting road between the SS. 125 and the city centre
Project for the renovation of a building, via Palabanda
Renovation of a building in the Municipality of Elmas
Restructuring project for adaptation of IPSIA
Construction work on a building for civil dwellings
Construction work for a shed in Z.I. Casic (Industrial Area)
Restructuring project of the Cooperative Winery of Quartu Sant'Elena
Supervision of works for the construction of technological systems
Port of Cagliari Planning Scheme
Port of Olbia Port Planning Scheme
Port of Alghero Planning Scheme
Technical and economic feasibility study of marinas
Feasibility study of the road network construction works
Programme of reorganization and rationalization of the port system